S.R. 67 Road Reconstruction

Albany, Indiana

The S.R. 67 project consisted of approximately four miles of rural state road and three-quarter mile of urban state road through Albany, Indiana. This project included: road reconstruction, road rehabilitation, vertical curve corrections, horizontal curve corrections, an intersection relocation and storm sewer reconstruction.

In addition to being the designer, Certified Engineering was responsible for all phases of right-of-way-engineering and surveying, as well as the design survey and the Location Control Route Survey Plat. Subsequent to preliminary design, we prepared 145 parcels for acquisition, which encompassed right-of-way plan development, legal descriptions, right-of-way parcel plats, transfer documents and right-of-way staking.

« Return to our gallery